Reference project

Mercedes-Benz central office building

Heating, cooling, ventilation, sanitary installations and full building automation — together with the MEP for a 2000-meal production kitchen.

Our task was the building services installation of the central office building — heating, cooling, ventilation and sanitary installations — and the full automation of the installed systems. We also delivered the complete MEP for the facility's 2000-meal production kitchen, including its special ventilated hygienic suspended ceiling.

Key figures

  • 3 × 80 kW redundant server cooling
  • 700 kW cooling capacity
  • outstanding fire protection solutions
  • full building automation with 9 networked control cabinets
  • project value: EUR 2 million in total

Request a quote

Have a building that needs to work?

Send us the drawings or a short description of the job — we will review it and agree the next step with you.